Problem
A dynamic guard on a forging machine repeatedly had bolts shear during operation, causing downtime and requiring maintenance to replace them. Because the forge was designed to operate continuously outside of scheduled downtime, these failures were slowing production and costing the company money.

The entire guard as seen from the back
Solution
It was found that while a forging die was moved into position, the gauge would be lifted in a way that put the guard’s weight on the bolts rather than the C channel it was designed to transfer weight onto. The new solution was to design a new guard for this equipment.
Basic Project Steps
- Discover the failure point and other potential failure points
- Take measurements of critical interfaces and other key features
- Hand-draw potential ideas
- Use SolidWorks to develop potential guards
- Run FEA simulations on ANSYS to ensure they will withstand expected impacts with a safety factor of 5
- Meet with a senior engineer and maintenance personnel to discuss designs
- Make changes to design based on engineer and maintenance recommendations
- Run FEA simulations on ANSYS to ensure they will withstand expected impacts with a safety factor of 5
- Final check-off with Senior Engineer and plant manager
- Finalize drawing and submit for fabrication
- Install and test new guard
- Pass off for continued use
-

Image of the guard after fabrication and installation. This piece of equipment is in use to this day.
Outcome
The final design has been implemented and has been in use for the past year and a half (as of August 2026). This equipment installation is projected to provide a cost saving of $50,000+ annually by reducing downtime and maintenance associated with the previous guard.